Hitachi has installed 8 office double deck elevators, 1 passenger elevator connecting the 3rd and 4th floors, and 4 escalators to The Okura Prestige Tower, a hotel reopened on September 12, 2019.
Hitachi has installed 8 office double deck elevators, 1 passenger elevator connecting the 3rd and 4th floors, and 4 escalators to The Okura Prestige Tower, a hotel reopened on September 12, 2019.